Rent rather than buy!

Explore the solutions offered by Tibbloc and discover how they can benefit manufacturers, network operators and other professionals .

Our achievements demonstrate our ability to increase production, minimize downtime and ensure the safety of installations operating with hot, cold, steam or compressed air systems.

Case studies

Contact us
Industrie

INDUSTRY

Epreuves-sous-Pression

Securing a production site

Express delivery and commissioning to maintain steam production during blockages.

photo chaufferies

Securing hot water production

Ensure continuity of industrial operations in the event of unforeseen gas interruptions.

photo installation

Temperature control

Maintain a constant 23°C with 35% relative humidity throughout the year to meet the specific requirements of the welding process, which also requires a total absence of air movement.

Nucléaire

Preparing for ten-yearly inspections

If your steam boiler is immobilized, Tibbloc offers a solution to keep your services running smoothly: a mobile, dual-fuel steam boiler.

Nucléaire

NUCLEAR

Nucléaire

8 MW of Heat

Rental of 8 MW hot water production equipment with associated accessories such as exchangers, pumps, V3V skids, etc.

air comprimé

Chemical cleaning

Rental of a 3 T/h steam boiler with feed tank and water treatment, and rental of 90 kW compressors and air dryers for the chemical process.

raffinerie

REFINERIES, PETROCHEMICALS & CHEMICALS

vapeur 17t

Pipe decontamination

Tibbloc has deployed three steam boilers, each with a capacity of 3 T/h, 6 T/h and 10 T/h.

photo installation

Process water

The installation of a boiler room system includes several essential elements to ensure optimal operation.

image chaufferie colza

Rape seed boiler room

Energy Transition: Installation of boilers as part of an oil-free platform.

photo installation

Securing a new plant

To cope with rising gas prices, a consequence of the opening of a new production unit, a 3 T/h combi-burner steam boiler was installed.

Industrie pharmaceutique

PHARMACEUTICAL INDUSTRY

Habitation

PUBLIC SERVICES

phot installation en cours

Wood boiler

Installation of a 250 kW wood-fired boiler, using both wood and pellets.

photo installation

District heating network

Tibbloc was responsible for operating the boiler for 36 hours, with a permanent human presence (3x 12h).