Heating / Dehumidification
More than 750m of flexible ducting with a diameter of 500mm was installed and almost 120,000m3/h of air was treated.
We are proud to share our news and achievements on this blog. Experts, reactive, 100% committed, we remain at your disposal on 0810 310 307
More than 750m of flexible ducting with a diameter of 500mm was installed and almost 120,000m3/h of air was treated.
Emergency installation of a 1 MW gas fired boiler room. Tibbloc’s intervention made it possible to heat the entire space.
Implementation of a 210 kW chiller following renovation works in a building. The rental period lasted 26 weeks.
Tibbloc provides you with complete boiler rooms in containers, in SPHP operation 24/72 hours.
After a full year of rental, Tibbloc has just provided the decomissioning of a temporary steam boiler room producing 19 tonnes/hour of steam.
Emergency rental of a 1.2MW 2-hour fireproof boiler (CF2H) for the production of domestic hot water and the heating of a swimming pool.
Emergency installation of a 550 kW glycol water production unit at -8/-4°C in Western France.
In 2022, Tibbloc launches its new website to better support your projects.
Video of performance testing of a 20 MW industrial heat exchanger for EDF.
Installation of a 210 kW chiller following the renovation work.
Tibbloc pre-manufacturing is featured in the magazine Chaud Froid Performance. Read the online article.
Installation of a 600 KW 2-hour fireproof boiler room to repair a reception building despite the snow.