29 December 2025
Maintaining production within a cheese factory
OBJECTIVES
Ensuring the cheese factory’s production continuity in the event of a main boiler failure, to avoid any interruption that could harm product quality or lead to financial losses.
CLIENT REQUEST
A cheese factory experienced a breakdown of its main boiler.
Our client therefore needed a temporary heating solution, capable of delivering 600 kW at 105 °C.
For a period of two weeks, the time required to carry out the repairs.
CHALLENGE
- React quickly to the emergency to avoid a production interruption and maintain the cheese production chain.
- Install a temporary boiler room meeting temperature and power requirements within a very short timeframe.
TIBBLOC SOLUTION
Tibbloc installed in less than 24 hours, a gas boiler room of 600 kW, capable of reaching a temperature of 105 °C.
Monitoring and maintenance during the two-week rental period to ensure the proper functioning of our installation.
PROFITS
- The cheese factory maintained its production without interruption, thus avoiding financial losses.
- A quick and efficient intervention, minimizing the consequences of the main boiler breakdown.
- Tibbloc managed both the installation and monitoring, allowing our client to focus on their activities without concerns.