OBJECTIVES


Ensuring the cheese factory’s production continuity in the event of a main boiler failure, to avoid any interruption that could harm product quality or lead to financial losses.

CLIENT REQUEST


A cheese factory experienced a breakdown of its main boiler.

Our client therefore needed a temporary heating solution, capable of delivering 600 kW at 105 °C.

For a period of two weeks, the time required to carry out the repairs.

CHALLENGE


  • React quickly to the emergency to avoid a production interruption and maintain the cheese production chain.
  • Install a temporary boiler room meeting temperature and power requirements within a very short timeframe.

TIBBLOC SOLUTION


Tibbloc installed in less than 24 hours, a gas boiler room of 600 kW, capable of reaching a temperature of 105 °C.

Monitoring and maintenance during the two-week rental period to ensure the proper functioning of our installation.

PROFITS


  • The cheese factory maintained its production without interruption, thus avoiding financial losses.
  • A quick and efficient intervention, minimizing the consequences of the main boiler breakdown.
  • Tibbloc managed both the installation and monitoring, allowing our client to focus on their activities without concerns.