Cooling Tower Shutdown in Nuclear Power Plants
OBJECTIVES
Ensure temporary cooling of circuits in the event of a nuclear power plant’s cooling tower shutdown to maintain thermal performance and guarantee plant safety during their unavailability.
CLIENT REQUEST
Our client needed temporary cooling solutions when these cooling towers are under maintenance or in technical shutdown. To thus r educe nuclear reactor downtime while maintaining safety standards. In order to g uarantee service continuity to avoid any disruption in the overall energy process.
CHALLENGE
- Maintain sufficient cooling capacity to prevent circuit overheating during cooling tower unavailability.
- Adapt cooling equipment to specific conditions (temperature, flow, pressure) and to confined spaces.
- Guarantee safety and compliance with strict nuclear industry standards.
TIBBLOC SOLUTION
Provision of chiller units for rental adapted to necessary thermal requirements.
Deployment of our equipment in record time, ensuring cooling continuity.
24/7 monitoring and maintenance with rapid intervention if necessary.
Equipment configuration and sizing according to specific site needs and technical constraints.
PROFITS
- Maintaining safety and ensuring the security of nuclear facilities.
- Limiting interruptions in energy production, thereby optimizing plant performance.