Data Center

Turnkey solutions, immediately deployable


Tibbloc supports data center operators, integrators and project owners with temporary, mobile and autonomous solutions to ensure business continuity, secure construction phases and validate critical infrastructures before production.
Rental of complete solutions: quick to deploy, scalable and adapted to critical environments, in France and internationally.

Temporary solutions designed for critical environments

Flexibility & operational agility

  • Custom, modular and scalable systems
  • Seamless implementation, without business interruption
  • 24/7 availability
  • National and international presence
  • Rigorously monitored and maintained equipment fleet

Continuous innovation

  • Ongoing technical monitoring
  • Energy optimization
  • Constant evolution of solutions
  • Certified quality and safety

Video production

Heating / Electrical Solutions

  • Continuity and validation of critical infrastructures
  • Business continuity and immediate backup
  • Advanced thermal and electrical simulations
  • Load banks for real-world testing
  • Commissioning and secure startup
  • Complete installation validation (FAT / SAT)
  • Load testing to ensure performance and resilience

Custom engineering, from design to operation, with audits, consulting and high-value recommendations.

Cooling Solutions

  • Thermal protection for data centers
  • Thermal continuity and immediate backup
  • Cooling for critical environments
  • Thermal load simulation
  • Testing under real operating conditions
  • Backup and redundancy solutions
  • Temperature optimization and control

Ideal for securing construction phases, equipment replacement or capacity increases.

Data Center Emergency Specialist

Operational capabilities

  • Emergency response in less than 24 hours
  • Rapid commissioning (Plug & Play)
  • Mobile, modular and temporary solutions
  • Crisis management and continuity plans
  • Scalable solutions

Our commitments

  • Dedicated partner for emergency management
  • 24/7 response in France and neighboring countries
  • Trained and organized teams: Sales → Order Processing → Logistics → Technical

Solution spotlight: Air heater 21 kW – Mobile load bank

Why?

  • Realistic thermal load simulation in IT rooms
  • Ideal during pre-equipment phase (racks not installed)
  • Uniform thermal load distribution

Key features

  • Power: 21 kW – 230V / 400V
  • Low ΔT – real conditions
  • Fine resolution: 1 kW
  • Mobile and easily movable

Added value

  • +20% time savings
  • 360° thermal & electrical view
  • Up to 200 banks controlled via PC
  • Real-time monitoring (P / U / I / ΔT)
  • Programmable tests up to 72 hours
  • Automated reports

Case studies

Commissioning for a major digital player
  • Thermal testing under real conditions
  • Total deployed power: 2.5 MW
  • Project completed in 7 weeks
  • Result: secure, flexible infrastructure compliant with deadlines
Cooling emergency – Operational continuity
  • Installation of 2 × 750 kW within 48 hours
  • Permanent monitoring and complete backup
  • Total cooling continuity during construction work
Testing in IT room under construction
  • 1 MW thermal load simulation
  • Complete cooling system validation
  • Risk-free testing before production