Maintaining comfort and hospital continuity

OBJECTIVES

Ensuring heating continuity in a hospital undergoing renovation, to guarantee ongoing patient comfort, service safety, and full functionality of sensitive medical equipment.

CLIENT REQUEST

Our client needed to undertake major work in their boiler room without interrupting building heating.
The client was looking for a reliable temporary solution that met hospital sector requirements, could be quickly integrated into their existing installation, and operate for several months without risk of interruption.


CHALLENGE

The main challenge was to provide a temporary heating system powerful enough to cover all the site’s thermal needs, while meeting the strict constraints of the hospital environment:

  • absolute service continuity,
  • safety and regulatory compliance,
  • rapid integration despite ongoing construction,
  • stable operation over a six-month period.

TIBBLOC SOLUTION

  • A 1.5 MW central heating boiler,
  • A 5,000 L fuel tank,
  • DN100 connections,
  • Full integration with the existing system,
  • Rapid delivery, installation, and commissioning of the equipment,
  • Ongoing technical support throughout the rental period.

This installation enabled perfect heating continuity, without disrupting hospital operations, despite the ongoing construction work.


PROFITS

  • Flexibility: Long-term rental with no initial investment, enabling cost control.
  • Reliability: Guaranteed heating capacity to ensure continuous and secure operations.
  • Speed: Rapid deployment meeting tight project deadlines.
  • Expert technical support: Comprehensive assistance from our teams to optimize installation performance.
  • Scalable and secure solution: A flexible and reliable response, ensuring client peace of mind throughout the project.