13 April 2023

300 kW boiler room in Belgium

Installation of a 300 kW boiler room in Belgium to keep an empty building frost-free during construction.
The demolition of an old building, behind a classified facade, meant that the gas supply to the entire site would be cut off during the estimated two years of work.
This winter, the general contractor had to ensure a temperature of 14°C in the other buildings on the site.